Business Partner (B1 3.3.2) – Negotiating Shipment Dates
Level 3Business Partner2:51
第 1 步:词汇
先认识这段音频里的关键词。标出你已经认识的,把精力放在新词上。
- Mmeet a deadline/miːt ə ˈdedlaɪn/B2
hoàn thành đúng hạn
本课出现: finish a task or project by the time it needs to be completed
compromise/ˈkɑːmprəmaɪz/B2thỏa hiệp
本课出现: find a solution where both sides give up something to reach an agreement
flexibility/ˌfleksəˈbɪləti/B2tính linh hoạt
本课出现: the ability to change or adapt easily
- MMy hands are tied.
I am unable to make changes because the situation is not in my control.
- Ccomponents
parts of a larger thing
- Ccover the costs
pay for something
- Gget back to (you)
respond or reply to (you)
- Cclear (the schedule)
approve (the schedule)
- Rroom to maneuver
the ability to change or adjust plans, flexibility
- Sstraight away
immediately, without delay
container/kənˈteɪnər/A2đồ để đựng
本课出现: a large metal box that is carried by ships and trucks (lorries) to transport goods (a shipping container)
- TThat could work.
That might be a good solution.
- Ccubic meters
a measurement of volume in meters (m 3 )
提示: 听之前先认识单词,理解起来会容易得多。
