الانتقال إلى المحتوى الرئيسي
Biibo English

Business Partner (B1 3.3.2) – Negotiating Shipment Dates

Level 3Business Partner2:51

الخطوة 1: المفردات

تعرّف على الكلمات الأساسية في هذا المقطع. حدّد ما تعرفه منها لتركّز على الجديد.

  • M
    meet a deadline/miːt ə ˈdedlaɪn/B2

    hoàn thành đúng hạn

    في هذا الدرس: finish a task or project by the time it needs to be completed

  • compromise
    compromise/ˈkɑːmprəmaɪz/B2

    thỏa hiệp

    في هذا الدرس: find a solution where both sides give up something to reach an agreement

  • flexibility
    flexibility/ˌfleksəˈbɪləti/B2

    tính linh hoạt

    في هذا الدرس: the ability to change or adapt easily

  • M
    My hands are tied.

    I am unable to make changes because the situation is not in my control.

  • C
    components

    parts of a larger thing

  • C
    cover the costs

    pay for something

  • G
    get back to (you)

    respond or reply to (you)

  • C
    clear (the schedule)

    approve (the schedule)

  • R
    room to maneuver

    the ability to change or adjust plans, flexibility

  • S
    straight away

    immediately, without delay

  • container
    container/kənˈteɪnər/A2

    đồ để đựng

    في هذا الدرس: a large metal box that is carried by ships and trucks (lorries) to transport goods (a shipping container)

  • T
    That could work.

    That might be a good solution.

  • C
    cubic meters

    a measurement of volume in meters (m 3 )

نصيحة: معرفة الكلمات قبل الاستماع تجعل متابعة المقطع أسهل بكثير.

المزيد من هذه السلسلة: Business Partner